Create a CEG Account  /  CEG Login



Allen RP235 and RP245 Polishing Riders Contain Improved Standard Features

June 9, 2020 - National Edition
Allen Engineering


RP235 RP245

Allen announced the debut of the RP235 and RP245 polishing riders. The RP235 and RP245 were designed with the high volume concrete polisher in mind.

These riding trowels come ready to achieve high rotor speeds and maintain high torque while polishing, and they also come equipped with retractable dolly jacks that ensure transportation indoors can be done with ease, as well as allowing for quick change of polishing pads.

These designs also are built on Allen's edging riding trowel frame to allow contractors to get extremely close to the wall while polishing.

RP235 standard features include:

  • Dolly jacks
  • Cruise control added
  • Water selector switch for front / rear spray nozzles
  • Brass spray nozzles instead of plastic
  • New 9 gallon water tank
  • Toggle switch for continuous spray
  • 180 rpm for high-speed burnishing or polishing
  • 40 lb propane bottle for longer lasting operating hours
  • 25 hp Kohler PCH740 propane engine
  • Two-point, top-mount lifting system
  • Four-point tie downs

    RP235

RP245 standard features include:

  • Dolly jacks
  • Cruise control added
  • Water selector switch for front / rear spray nozzles
  • Brass spray nozzles instead of plastic
  • New 9 gallon water tank
  • Toggle switch for continuous spray
  • 180 rpm for high-speed burnishing or polishing
  • 40 lb propane bottle for longer lasting operating hours
  • 25 hp Kohler PCH740 propane engine
  • Power steering option for operator comfort
  • Two-point, top-mount lifting system
  • Four-point tie downs

    RP245

For more information, visit www.alleneng.com.


Today's top stories

IDOT Transforms I-57 With $325M Expansion

USACE Handles Hangar Construction at Fort Riley, Kan.

Making Work Zones Safer

Hayden-Murphy Welcomes Guests to Elk River Open House

APWA Snow Conference Brings Industry Together in Cleveland

Royals, Hallmark Plan $3B Crown Center Stadium Project

New SR 141 Alignment Promises Smoother Travel Through Middle Tennessee

Webber–United JV Advances $620M I-16/I-75 Interchange


 





×

Stay Ahead of the Market

Get weekly equipment news, auction updates, and dealer insights — trusted by thousands of industry professionals.



39.95234 \\ -75.16379 \\ Philadelphia \\ PA \\ US \\ 19019