On Oct. 1, the Colorado Department of Transportation (CDOT) began installation of a new rock fence on U.S. 550 (Red Mountain Pass). Travelers can expect intermittent closures just south of Ouray, Colo., as crews begin repairing netting and fencing on the Ruby Wall's cliff face. This work — the final stage of ongoing repairs — addresses damage caused by severe flooding, mud flows and rockfall this summer.
The Colorado Transportation Commission has approved emergency contingent funds to complete this needed work, which includes the following:
- Crews will repair the draped netting that hangs on the face of the cliff wall. The netting — which traps falling rock — will also be tied down with additional new anchors drilled into the cliff wall.
- Crews also will construct a new, taller catchment fence and install it below an older, existing one. This will require drilling of post anchors, installing steel beam posts and additional rock netting. No rock scaling work is expected, except for minor clearing of loose rock for post and anchor installation. (Rock scaling is the removal of loose rock material, which may present a rockfall hazard on the highway.)
The new supplemental netting and fencing will increase the capacity for debris, which falls from the cliff walls and may present a rockfall hazard on the highway.
Travel Impacts Most Work Days
Periodic Lengthy Closures
CDOT will notify the public of closures via COtrip.org, social media, electronic road signs and local media.
Schedule
This project's targeted completion date is Nov. 1, with a goal to finish the work before significant snow begins to fall. As a result, inclement weather may impact the duration of the project.
Project Info
In mid-August, crews completed emergency repair work to the damaged road surface of U.S. 550, as well as repairs to a damaged crib wall, which provides support and stabilization of the road surface. Minor scaling operations also were completed.











