Create a CEG Account  /  CEG Login



Guy F. Atkinson Construction, Clark Water Celebrate Groundbreaking of LYHBeyond

Guy F. Atkinson Construction and Clark Water celebrated the groundbreaking of LYHBeyond, the Blackwater CSO Tunnel project in Lynchburg. The project aims to protect the James River from combined storm and sewer events, with completion expected in 2027. Stantec and Wiley Wilson are among the project leads.

October 31, 2024 - National Edition #23
Clark Construction


On Oct. 29, Guy F. Atkinson Construction and Clark Water broke ground alongside city of Lynchburg officials on the LYHBeyond, the Blackwater CSO Tunnel project.

The new tunnel and pump station will create storage capacity and infrastructure to ensure that the James River is protected from combined storm and sewer events, marking a notable step towards Atkinson and Clark Water's shared mission to deliver complex infrastructure to protect the communities, people and ecosystems where we live.

The Blackwater CSO Tunnel will start at the CSO 52 site located along the Point of Honor Trail and will travel all the way to the bottom of Seventh Street in downtown Lynchburg, following the path of the Blackwater Creek toward the James River.

The scope of the project includes a new 4,715-ft. combined sewer overflow (CSO) tunnel with an internal diameter of 12 ft., as well as several new diversion and overflow structures to divert excess flows from the Blackwater Creek Interceptor (BWCI) and James River Interceptor (JRI) into the tunnel and pump station respectively.

The dewatering pump station is designed to streamline the tunnel and shaft draining process to approximately 24-36 hours.

To support the pump station, an electrical building also will be built to house and maintain the necessary electrical, instrumentation and control components. In addition to the new structures and their associated utility needs, on-site restoration will be implemented throughout the project.

Stantec is the project engineer, and Wiley Wilson is the project architect. Substantial completion is slated for summer 2027.

For more information about the project, visit https://www.lyhbeyond.org/

For more information about Guy F. Atkinson Construction and Clark Water, visit atkn.com and www.clarkgroup.com/companies/clark-water.


Today's top stories

New SR 141 Alignment Promises Smoother Travel Through Middle Tennessee

Webber–United JV Advances $620M I-16/I-75 Interchange

Thompson Tractor Hosts Companywide Used Equipment Sale

Georgia Power Begins Construction of Battery Storage System

Werk-Brau Names Gold Coast JCB as South Florida Dealer

BOMAG Names Mid South Machinery Full Line Dealer for State of Mississippi

Louisiana Breaks Ground On $2.3B I-10 Calcasieu River Bridge

James River Equipment Named Newest Trimble Technology Outlet, Serving Customers in Mid-Atlantic


 





×

Stay Ahead of the Market

Get weekly equipment news, auction updates, and dealer insights — trusted by thousands of industry professionals.



39.95234 \\ -75.16379 \\ Philadelphia \\ PA \\ US \\ 19019