Create a CEG Account  /  CEG Login



New Hood Canal Bridge Pieces Now in Place

June 17, 2009 - West Edition
Construction Equipment Guide

PORT GAMBLE, Wash. (AP) Pontoons, trusses, drawspan — all the major components are in place for the renovation of the Hood Canal floating bridge.

Transportation Department spokeswoman Becky Hixson told The Kitsap Sun it’s now a matter of making all the connections, wiring and testing.

Officials expected a six-week closure when they shut down the bridge May 1 for the $500 million project.

The department said the 8,869-ft. (2,700 m) long bridge between the Kitsap and Olympic peninsulas is the longest floating bridge in the world over saltwater.


Today's top stories

New SR 141 Alignment Promises Smoother Travel Through Middle Tennessee

Webber–United JV Advances $620M I-16/I-75 Interchange

Thompson Tractor Hosts Companywide Used Equipment Sale

Georgia Power Begins Construction of Battery Storage System

Werk-Brau Names Gold Coast JCB as South Florida Dealer

BOMAG Names Mid South Machinery Full Line Dealer for State of Mississippi

Louisiana Breaks Ground On $2.3B I-10 Calcasieu River Bridge

James River Equipment Named Newest Trimble Technology Outlet, Serving Customers in Mid-Atlantic


 





×

Stay Ahead of the Market

Get weekly equipment news, auction updates, and dealer insights — trusted by thousands of industry professionals.



39.95234 \\ -75.16379 \\ Philadelphia \\ PA \\ US \\ 19019