Create a CEG Account  /  CEG Login



Potain Launches PowerBoost to Add Battery Capacity to Self-Erecting Cranes

Potain launches PowerBoost for self-erecting cranes, offering a plug-and-play battery solution for increased flexibility on job sites. The new system eliminates noise and emissions, and can provide up to two working days of power with fast charging capabilities.

March 30, 2026 - National Edition
Manitowoc/Potain

A new battery pack for Potain self-erecting cranes will bring greater flexibility to job sites.
Potain photo
A new battery pack for Potain self-erecting cranes will bring greater flexibility to job sites.
A new battery pack for Potain self-erecting cranes will bring greater flexibility to job sites.   (Potain photo) PowerBoost offers a plug-and-play battery solution that can serve as a standalone power source or work in conjunction with the on-site power supply.   (Potain photo) Once connected, PowerBoost can install and erect the crane and deliver up to two working days of power.   (Potain photo) Depending on the job site and local setup, customers can choose how and when they use PowerBoost.   (Potain photo) PowerBoost can be attached during transport and drive the crane when it is positioned via remote control.   (Potain photo) If PowerBoost is used in conjunction with the local, on-site electricity supply, the two work together to regularly recharge the batteries and the crane uses minimal grid power for better efficiency and cost savings.   (Potain photo)

A new battery pack for Potain self-erecting cranes will bring greater flexibility to job sites.

The new, maintenance-free PowerBoost launched on the Potain Igo M 24-19, which debuted on the global stage at bauma 2025. It offers a plug-and-play battery solution that can serve as a standalone power source or work in conjunction with the on-site power supply.

"Unlike a diesel generator, there's no noise or emissions with PowerBoost," said Remi Deporte, self-erecting cranes product manager of Manitowoc. "This also eradicates the need to transport fuel to the job site and can help reduce overall project costs. It's an ideal product for a range of applications, including sensitive renovation projects or other sites with restrictions on sound or air quality. It also means customers can continue to use the crane even if there's an issue with the local grid supply."

Once connected, PowerBoost can install and erect the crane and deliver up to two working days of power. It has 16 kWh absorbed glass mat (AGM) batteries with an input rating of 230 V and a current range of 10 A to 16 A. Output is 230 V and up to 32 A. Fast charging is possible too, taking just 2 hours 15 mininutes to go from 50 percent to 85 percent capacity when using a 16 A power supply.

Depending on the job site and local setup, customers can choose how and when they use PowerBoost. For example, if used as a standalone source for lifting operations only, it can deliver an 8-hour workday with 50 load cycles.

Alternatively, customers can use PowerBoost for set-up and tear-down, in which case it can perform these tasks twice on a single charge, including commissioning the crane. PowerBoost can be attached during transport and drive the crane when it is positioned via remote control.

If PowerBoost is used in conjunction with the local, on-site electricity supply, the two work together to regularly recharge the batteries and the crane uses minimal grid power for better efficiency and cost savings.

The first Potain Igo M 24-19 equipped with PowerBoost was purchased by Valem, a Potain dealer in France. The first job was at a project to restore the old ramparts in the historic village of Hiers-Brouage in Charente-Maritime district, for local specialist contractor Hory-Chauvelin.

For more information, visit manitowoc.com.

This story also appears on Crane Equipment Guide.


Today's top stories

IDOT Transforms I-57 With $325M Expansion

USACE Handles Hangar Construction at Fort Riley, Kan.

Making Work Zones Safer

Hayden-Murphy Welcomes Guests to Elk River Open House

APWA Snow Conference Brings Industry Together in Cleveland

Royals, Hallmark Plan $3B Crown Center Stadium Project

New SR 141 Alignment Promises Smoother Travel Through Middle Tennessee

Webber–United JV Advances $620M I-16/I-75 Interchange


 





×

Stay Ahead of the Market

Get weekly equipment news, auction updates, and dealer insights — trusted by thousands of industry professionals.



39.95234 \\ -75.16379 \\ Philadelphia \\ PA \\ US \\ 19019