Create a CEG Account  /  CEG Login



Skanska Completes Renovations for Boston College, Northeastern University

Skanska completes summer renovations at Boston College and Northeastern University, including upgrades to Higgins Hall and Robinson Hall. Projects focus on enhancing facilities for upcoming fall semester. Skanska's expertise shown in small-scale projects complements large-scale portfolio.

October 22, 2024 - Northeast Edition #23
Skanska

For the renovations at Boston College’s Higgins Hall, the $2 million project entailed the demolition of the auditorium’s existing seating, replacement of the flooring and installation of new finishes for the ceiling soffits and acoustic wall panels.
Photo courtesy of Skanska
For the renovations at Boston College’s Higgins Hall, the $2 million project entailed the demolition of the auditorium’s existing seating, replacement of the flooring and installation of new finishes for the ceiling soffits and acoustic wall panels.

Skanska, a global construction and development firm, announced the completion of renovations for two local educational facilities, including Boston College's Higgins Hall and Northeastern's Robinson Hall.

These projects referred to as "summer slammers," concentrate on upgrading educational facilities during the summer months in preparation for the student's return to campus for the upcoming fall semester.

"We're incredibly proud to announce the completion of two intensive summer slammer projects in the New England region," said Mark Lootz, vice president — project executive of Skanska USA Building's New England Region. "Our team continues to set a new bar for the firm's work on small-scale projects such as these, and we're thrilled to continue delivering renovations to local universities that will improve the academic experiences of their students."

Renovations to Northeastern's Robinson Hall, an $11 million, 35,000-sq.-ft. replacement of the five-story academic building, included the installation of a new rooftop unit and over 100 variable air volume systems (VAVs) to ensure optimal climate controls across all floors. Skanska also was responsible for implementing new fire protection and alarm systems. Small fit-outs were bundled into the project, including two classrooms, the entry lobby and a dance studio.

Following Skanska's renovations on Higgins Hall at Boston College last summer, which included a $1.5 million renovation, and as part of BC's overall masterplan to refurbish multiple auditoriums on campus, Skanska returned this summer to continue its renovation of the 1,600-sq.-ft. auditorium. The $2 million project entailed the demolition of the auditorium's existing seating, replacement of the flooring and installation of new finishes for the ceiling soffits and acoustic wall panels. Modifications also were made to the electrical system, as well as upgrades to projectors, screens, microphones, speakers and cameras.

Skanska's robust portfolio with Boston College first began in 2019 to renovate the Margot Connell Recreation Center, now a cornerstone for the school community. The project included demolishing the previous recreation center and building a new $127 million, 244,000-sq.-ft., four-story facility, which consists of a 25-meter competitive swimming pool, rock climbing wall, wellness room, badminton, tennis, basketball and squash courts, along with other student amenities.

These summer slammer projects showcase Skanska's adept ability to handle smaller-scale projects in addition to its specialty in large-scale projects.


Today's top stories

New SR 141 Alignment Promises Smoother Travel Through Middle Tennessee

Webber–United JV Advances $620M I-16/I-75 Interchange

Thompson Tractor Hosts Companywide Used Equipment Sale

Georgia Power Begins Construction of Battery Storage System

Werk-Brau Names Gold Coast JCB as South Florida Dealer

BOMAG Names Mid South Machinery Full Line Dealer for State of Mississippi

Louisiana Breaks Ground On $2.3B I-10 Calcasieu River Bridge

James River Equipment Named Newest Trimble Technology Outlet, Serving Customers in Mid-Atlantic


 





×

Stay Ahead of the Market

Get weekly equipment news, auction updates, and dealer insights — trusted by thousands of industry professionals.



39.95234 \\ -75.16379 \\ Philadelphia \\ PA \\ US \\ 19019