Create a CEG Account  /  CEG Login



Steel Plant Partners With Cog Railway for Winter Work

August 16, 2018 - Northeast Edition #17
The Associated Press

The Cog Railway is starting to redo the entire line from the base to the summit.
The Cog Railway is starting to redo the entire line from the base to the summit.

BERLIN, N.H. (AP) A 50,000-sq.-ft. steel plant has partnered with the Mount Washington Cog Railway to be used as a winter shop for maintenance and construction of locomotives and passenger coaches.

The Isaacson Steel fabrication plant in Berlin was acquired by David Presby at an auction several years ago. His brother, Wayne Presby, is president of the Cog Railway and was exploring the idea of replacing or expanding its workshops at the base of Mount Washington.

The Cog Railway is starting to redo the entire line from the base to the summit. Presby Steel will be making tie plates and supplying steel for a new work car with lights, heat, a crane, tools, welders and generators. Wayne Presby said work will now be done on the rail line all winter.


Today's top stories

New SR 141 Alignment Promises Smoother Travel Through Middle Tennessee

Webber–United JV Advances $620M I-16/I-75 Interchange

Thompson Tractor Hosts Companywide Used Equipment Sale

Georgia Power Begins Construction of Battery Storage System

Werk-Brau Names Gold Coast JCB as South Florida Dealer

BOMAG Names Mid South Machinery Full Line Dealer for State of Mississippi

Louisiana Breaks Ground On $2.3B I-10 Calcasieu River Bridge

James River Equipment Named Newest Trimble Technology Outlet, Serving Customers in Mid-Atlantic


 





×

Stay Ahead of the Market

Get weekly equipment news, auction updates, and dealer insights — trusted by thousands of industry professionals.



39.95234 \\ -75.16379 \\ Philadelphia \\ PA \\ US \\ 19019