Create a CEG Account  /  CEG Login



UDOT Repairs Bridges Over Jordan River Surplus Canal

April 9, 2019 - West Edition #8
Utah Department of Transportation

The Utah Department of Transportation (UDOT) advised drivers to plan ahead for a long-term lane closure on westbound I-80 near the I-215 west belt. Westbound I-80 is reduced to two lanes for approximately four months to allow crews to replace the decks (driving surfaces) on the I-80 bridges over the Jordan River Surplus Canal.

During this work, lanes also will be shifted on both westbound and eastbound I-80, and drivers traveling from the airport to eastbound I-80 will need to merge into through traffic sooner than they currently do. Heavier than normal traffic and delays of 10 minutes or more are expected during commute hours. Access to the airport will remain open throughout the project. To reduce delays, UDOT recommends using S.R. 201 as an alternate route.

The decks on these I-80 bridges are being removed and replaced as part of UDOT's ongoing efforts to keep Utah's roads and bridges in good condition. The new bridge surface is designed to accommodate the 71,000 vehicles per day that travel this section of the freeway. Work on the project is scheduled for completion this June.


Today's top stories

New SR 141 Alignment Promises Smoother Travel Through Middle Tennessee

Webber–United JV Advances $620M I-16/I-75 Interchange

Thompson Tractor Hosts Companywide Used Equipment Sale

Georgia Power Begins Construction of Battery Storage System

Werk-Brau Names Gold Coast JCB as South Florida Dealer

BOMAG Names Mid South Machinery Full Line Dealer for State of Mississippi

Louisiana Breaks Ground On $2.3B I-10 Calcasieu River Bridge

James River Equipment Named Newest Trimble Technology Outlet, Serving Customers in Mid-Atlantic


 





×

Stay Ahead of the Market

Get weekly equipment news, auction updates, and dealer insights — trusted by thousands of industry professionals.



39.95234 \\ -75.16379 \\ Philadelphia \\ PA \\ US \\ 19019