Description:
LBX240 Material Handler, *All new hoses, pipes and clamps on the Stick & Boom as necessary, *All new pins, bushings and grease seals installed for Main Boom & Stick, *2 Boom Cylinders Repacked, *2 Stick Cylinders Repacked, *1 Took Cylinder Repacked, *New EGR Cooler and Gasket, *New Seat Cushions installed, *New heavy duty rub rails installed, *New Rear Pump Door installed, *Complete Engine Service, *Gear oil changed in both travel gear boxes, *Changed oil in the main swing box, *Cab Interferance wiring replaced, *2 New batteries, *Main Magnet control box repaired as needed, *All of the hydraulic filters have been changed, *New hydraulic oil, *All hydraulic leaks have been repaired, *Machine comes with a complete set of new Manuals (Service, Parts & Operators), *All cab switches and panels were replaced as necessary